Construction of PMMA
Scope of application:
Refrigeration storage, fast fix( crack, pothole of load, maintenance of structure, joint repair, runway repair, the repair of highway and bridge floor, etc.); also used on waterproof for roof.
Substrate treatment:
Concrete surface: The same requirements as for epoxy flooring.Metal plate substrate: De-rust, de-grease, polishing.Attention: Mixing resin-cement paste materials which dissolve in MMA to the substrate is forbidden.
Coating:
Primer coating: Resin consumption is approx. 0.3Kg/m2, using roller, brush, trowel or other tools.Intermediate coating: Resin consumption is approx. 0.5Kg/m2, the ratio of resin: quartz sand is approx. 1:1; coating by trowel.Top-coat: Resin consumption is approx. 0.3Kg/m2, (for self-leveling: >0.8Kg/m2 ) using roller, brush, trowel or other tools.
Curing: Set rapidly after 1-2 hours under room temperature, can complete the work in one day.
Website: http://www.sinopolymer.com.cn Phone: (86) 21-51592806 (86) 21-51592807 Fax: (86) 21-51592805 Zip: 200231 Address: Room 516, No4# Building, 218 Yindu Rd. Xuhui District, Shanghai
E-mail: marketing@sinopolymer.com.cn (Marketing Dept.)